Cheap Prefab Steel Frame Labor Camp
US $ 65.00
4.9
Hits 6
Total Stock 1000 square meter

Item Details

Basic Info
  • Model NO.: steel frame labor camp
  • Usage: Warehouse, Villa, Temporary Offices, Workshop
  • Customized: Customized
  • Color: Customized
  • Accessory: According to Your Request
  • Trademark: HEYA
  • Specification: 180 square meter per 40′HQ.
  • HS Code: 9406000090
  • Material: Steel Structure
  • Certification: ISO, CE, BV
  • Product: Camping House
  • Size: Customized
  • Roof&Wall Material: Sandwich Panel
  • Transport Package: Standard Export Package.
  • Origin: China
Product Description

Cheap prefab steel frame labor camp 

Product Details

1. Main Material of Prefab Houses:

a. The roof and wall is sandwich panel. However, there are other materials you can choose, such as the Rock wool sandwich panel, Polyurethane sandwich panel, PU foam sandwich panel.

b. The frame is the C section steel and the Angle iron. The thickness is depending on you!
Cheap Prefab Steel Frame Labor Camp

 2. More details of Prefab Houses:
1) Structure: light steel as its main frame, which is safe and reliable; sandwich panels as its roof
and wall boards, which is in equisite looks and beautiful decoration.

 2) Environmental protection and economized: prefab houses are reasonable in design, can be removed or recycled more than 5 times, and it can service 10 years or longer. 
3) Applications: prefab houses can be used as permanent & temporary residence, laborers accommodation, office, workshop, warehouse, etc.
4) Advantages: High performance in quakeproof, waterproof, windproof, moisture proof, heat insulation and sound insulation. 
5) Inside facilities: Floorings, ceiling, water system, electrics, toilets, etc. are optional for clients' choice.
6) Quick installation: It is convenient to install, a skilled worker can install 20sqm-30sqm one day. 
7) Transportation: The completely knock-down of prefab house components can save more space
of the sea container and make the freight cost of house much lower.
 

Cheap Prefab Steel Frame Labor Camp3. Other Points:
a. Prefab houses can be used in building site, low cost, easy installation, reusable, energy conservation.
b. Used in building site and can be reused in lots of projects, which is very economical.
c. Prefab houses can be designed as accommodation, office, control center, canteen and so on.
d. The low-cost, easy assemble and disassemble, reusable are the most outstanding advantages of this house. 
e. We can design the style according to your different requirements and the building site weathers. It's fireproof, waterproof, quakeproof and heatproof. 
f. The partition of the wall is depend on you, we can design what partition you want. 
g. Excellent in the feature of typhoon and earthquake proofing grade is 8 grades, and the earthquake proofing grade is 7 grades. 
h. The using life is around 10-15 years. Environmental protection and economical.
I. Each worker can assemble 20~30 square meters every day. 6 workers can finish 300sqm prefab house in 2 days.
j. Loading: 320 square meters can be loaded in one 40 feet shipping container.
Cheap Prefab Steel Frame Labor Camp

Certification
Cheap Prefab Steel Frame Labor Camp
Global Cooperation

Cheap Prefab Steel Frame Labor Camp
Packaging & Shipping
 

Packaging 
Mixed packaging:roof frame and bottom frame will be packed together 
with bolts;all the wall panels packed together with wooden pallet in the bottom,corrugated board on the surface,and XPS board in the inter-space. And it will be shipped in 40' container.
  
 
 
Unloading
40 feet ocean freight container:
A: Take out the small packages.
B: Use folk lift to take out the wall panel packages.
C: Grapple the corner on bottom side of the container house and drag
the package out,remain about 50cm in the shipping container.
D: Use folk lift to lift the container package in the middle and move it out 
of the shipping container.
E: Put the package on ground side-wise, use wooden pad if it's flat-wise.
Cheap Prefab Steel Frame Labor Camp

FAQ:
 
1, What's your Payment term?
50% deposit by TT, 50% balance before loading container by TT; 100% LC at sight(total 
payment over 100,000USD);
 
2, How about Shipping?
We use 40HQ container to ship the goods; Usually 40HQ container can load about 160-180 
square meters house. 
3, Delivery time?
Depend on MOQ,usually we can arrange shipment around 10days after received deposit. 
4, How to install?
Usually we will provide installation drawing, and if necessary,we also provide installation video.   
5, Can you send workers to help me build house?
Considering the labor cost, safety and visa issues, we suggest to send one or two engineers 
to guide and train your staffs.  You must provide air tickets, hotel, and meal, and 100USD 
per day
 for engineer salary.
,house,prefabricated,steel,
VIEW ALL

Contacts

SHANDONG HEYA CONSTRUCTION TECHNOLOGY CO., LTD.

Name:
China_Heya(Mr.)
Drag the slider to the right to fill the puzzle.
VISIT MINISITE
More products from this supplier

Cheap Prefab Steel F

US $  65.00

product options

Cheap Prefab Steel Frame Labor Camp

US $ 65.00

US $ 78.00

Quantity

- +

Stock:1000 square meter

product options

Cheap Prefab Steel Frame Labor Camp

US $ 65.00

US $ 78.00

Quantity

- +

Stock:1000 square meter

Shipping Logistics >>
Options
  • Contact Seller